Eskom has extended Stage 3 load-shedding.
The power utility said this is due to the failure of two units at Kendal power station and a unit each at Kriel and Arnot.
Eskom announced that stage 3 load-shedding was extended from 5am on Thursday until further notice.
Eskom is still to give a full update.
The post Stage 3 load-shedding extended due to failure of units at Eskom stations appeared first on Mbare Times.